Two to four days for most homes, then a week or two of being gentle with it. Here is the schedule.

The work

Day one is sanding: the big machine, the edger, the corners, the vacuum. If you are staining, the stain usually goes on at the end of day one or the start of day two and needs to dry fully. Then the coats. A waterborne finish dries in a few hours, so two or three coats can go on in a day. An oil-modified finish needs most of a day between coats.

After the last coat

  • Socks only, for the first day.
  • Furniture back after two or three days, lifted, never dragged, with felt pads on every leg.
  • Pets after two or three days.
  • Rugs after about two weeks, when the finish has cured hard.

Cool, damp weather slows drying and warm, dry weather speeds it. Keep the heat or the air conditioning running at its usual setting.